The Jubilee River story - Slough Weir problems - 2005 - 680,000

Sub-standard design - extensive damage - costly repair!

Slough Weir and associated downstream banks were severely damaged in January 2003.  Repairs in 2005 cost 680,000.

In order to execute the works it was necessary to reduce the water level in the down stream reach thus leaving the Black Potts Weir dry.

Slough Weir saga